Gym Renovation Design: Follow-up Q&A Sessions

Thank you everyone for submitting feedback regarding the 3 design schemes for the Gym Renovation project. After calculating the collected votes, the results are as follows:

  • Design 2 (Warm Timber Strips): (52/85 = 61%)
  • Design 1 (Minimalist Paint): (24/85 = 28%)
  • Design 3 (Contemporary Metal): (9/85 = 11%)

The renovation team has provided responses to the congregation’s comments & questions raised during the SGM and from the feedback forms:

In addition, the team will be arranging a follow-up Q&A session on Wednesday March 27 and April 3, 8:30pm-9:30pm on Zoom, to further respond to brothers and sisters’ comments. The Zoom link can be found below (same link for both Q&A sessions):

Join Zoom Meeting
Meeting ID: 853 6446 0794
Passcode: 499053

0 Comments

Add a Comment

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.