Thank you everyone for submitting feedback regarding the 3 design schemes for the Gym Renovation project. After calculating the collected votes, the results are as follows: Design 2 (Warm Timber Strips): (52/85 = 61%) Design 1 (Minimalist Paint): (24/85 = 28%) Design 3 (Contemporary Metal): (9/85 = 11%) The renovation team has provided responses to…